1- Insulation coordination studies are essential in order to achieve optimum reliable systems.

 

 

2- Substation equipment should have been fully typed tested to the relevant latest IEC Standards

 

 

3- In future spark gaps and arcing horns to be discouraged for usage as element s for over voltage protection in substations.

 

 

4- It is strongly recommended to use reliable and economic metal oxide surge arrestors.

 

 

 

5- Polymeric (silicon rubber) insulators up to now seem optimal for the GCC countries, however still more exchange of experience regarding the long-term performance is required.

 

 

6- Modern analysis techniques should be used for system studies regarding over voltage protection of air insulated switchgear (AIS) and gas insulated switchgear (GIS) substations.