Study Committee 2

Study Committee NO:(2)


Study Committee No. : (2) :Cables & Overhead Lines

          Scope

  • Theory, design, applications, manufacture, installation, testing, operation, maintenance and diagnostics techniques for land and submarine, AC and DC insulated cable systems.
  • The design, the construction and the operation of overhead lines including the mechanical and electrical ( in cooperation with SC C4) design of line components(conductors, ground wires, insulators, accessories, structures and their foundations).
  • The validation tests, the study of in service performance and the assessment of the state of line components and elements.
  • The maintenance and the refurbishment and life extension as well as upgrading and up rating of overhead lines.
  • Related to SC B1, and SC B2 of CIGRE “for more information please visit…”

http://www.cigre-b1.org/

http://www.cigre-b2.org/

 

Chairman of Study Committee No. (2)

Eng/ Abdulaziz A. Al-Nuaim

Manager, Lines Maintenance East Division

Saudi Electricity Company

Email: LMCLEDV@se.com.sa

Tel. +9663-882-5936 Extention # 83501

P.O. Box: 5190 – Dammam 31422

Kingdom of Saudi Arabia

News
Events

+974 44620497



info@cigre-gcc.org

Facebook
Twitter
Youtube
instagram
© 2017 GCC Cigre | All right reserved.